Hybrid Dry/Wet Cooling Tower System Design
And Operations
17-Story Condo Building - 1000 GPM Capacity
System Overview
Design Parameters:
Capacity: 1000 GPM
Inlet Temperature: 97°F
Outlet Temperature: 86°F
Heat Rejection: 5,500,000 BTU/hr
Design Wet Bulb: 78°F (Miami summer)
Design Dry Bulb: 95°F
Switchover Temperature: 65°F dry bulb
Equipment Specifications
Primary Cooling Units (2 Units - 50% Each)
Manufacturer: EVAPCO eco-ATWB-H Series or equivalent Model: eco-ATWB-H-1847 (500 GPM each)
Physical Dimensions per Unit:
Length: 20'-0"
Width: 8'-6"
Height: 12'-0"
Operating Weight: 32,000 lbs (vs 45,000 lbs traditional)
Dry Weight: 18,000 lbs
Heat Exchanger Specifications:
Coil Type: Finned tube, closed circuit
Tube Material: 304 stainless steel
Fin Material: Aluminum, corrosion-resistant coating
Fin Spacing: 8 FPI (fins per inch)
Extended Surface Area: 12,500 sq ft per unit
Tube Arrangement: Counter-flow design
Fan System:
Fan Type: Axial flow, induced draft
Fan Diameter: 84 inches
Fan Motor: 20 HP premium efficiency
Speed Control: Variable frequency drive (VFD)
Sound Level: 82 dBA @ 3 feet (reduced from 95 dBA)
Spray System (Wet Mode):
Spray Nozzles: 2" rotary spray, clog-resistant
Spray Pump: 5 HP, VFD controlled
Spray Pressure: 1.2 psi minimum
Water Distribution: Uniform spray pattern
Drift Eliminators: High-efficiency, <0.005% drift rate
Control System Specifications
Automatic Mode Control
Dry Bulb Switchover Logic:
65°F and below: Dry mode only (fans + no spray)
65°F to 75°F: Hybrid mode (fans + partial spray)
75°F and above: Full wet mode (fans + full spray)
Control Components:
Main Controller: Programmable logic controller (PLC)
Temperature Sensors: RTD sensors (±0.2°F accuracy)
Weather Station: Ambient temperature/humidity monitoring
Flow Meters: Magnetic flow meters for water flow
VFD Integration: Modbus communication protocol
Energy Optimization Features:
Load-based fan speed: Adjusts to actual heat load
Staging logic: Operates single unit at low loads
Night setback: Reduced operation during off-peak
Predictive controls: Weather forecast integration
Structural Design Requirements
Foundation System:
Concrete Pads: 22' x 10' x 3' thick each
Anchor Bolts: 1.5" diameter, 36" embedment
Vibration Isolation: Neoprene pads, 2" thick
Drainage: Integrated drain system
Wind Load Design:
Design Wind Speed: 150 mph (Hurricane Category 4)
Uplift Resistance: 75 psf
Lateral Bracing: Steel frame tie-downs
Safety Factor: 2.0 on all connections
Structural Modifications Required:
Roof Reinforcement: Additional steel beams
Load Distribution: Spread loads to building columns
Seismic Restraints: Flexible connections for movement
Access Platforms: Service walkways and railings
Piping and Pumping System
Primary Circulation Pumps:
Quantity: 2 operating + 1 standby
Capacity: 500 GPM each @ 75 ft TDH
Motor: 60 HP, premium efficiency
Control: Variable frequency drives
Location: Mechanical room (reduced from roof)
Piping Specifications:
Material: Schedule 40 steel, insulated
Insulation: 2" thick, closed-cell foam
Pipe Sizes:
Main headers: 12" diameter
Unit connections: 8" diameter
Makeup/overflow: 4" diameter
Expansion System:
Expansion Tank: 500 gallon capacity
Pressure Relief: 125 psi setting
Fill/Drain: Automatic makeup system
Isolation Valves: Each unit individually serviceable
Water Treatment System
Chemical Treatment:
Biocide System: Automated chlorine dioxide generation
Scale Control: Phosphonate-based inhibitor
Corrosion Control: Molybdate/phosphate blend
pH Control: Automated acid feed system
Water Quality Monitoring:
Conductivity: Continuous monitoring
pH: Continuous monitoring with alarms
Biocide Residual: Automatic testing
Blowdown Control: TDS-based automatic blowdown
Legionella Prevention:
UV Sterilization: 40 GPM UV system
Temperature Monitoring: Continuous logging
Cleaning Protocols: Automated cleaning cycles
Testing Schedule: Monthly third-party testing
Performance Specifications
Cooling Performance:
Design Conditions: 95°F DB / 78°F WB
Guaranteed Outlet: 86°F ± 1°F
Approach Temperature: 8°F wet bulb
Range: 11°F (97°F to 86°F)
Operating Modes Performance:
Dry Mode (65°F and below):
Capacity: 100% at 65°F DB
Power Consumption: 40 kW (fans only)
Water Usage: Zero
Hybrid Mode (65°F to 75°F):
Capacity: 100% with partial spray
Power Consumption: 50 kW (fans + partial spray)
Water Usage: 30% of full wet mode
Full Wet Mode (75°F and above):
Capacity: 100% with full spray
Power Consumption: 60 kW (fans + full spray)
Water Usage: 15 GPM evaporation + 5 GPM blowdown
Annual Operating Profile (Miami Climate):
Dry Mode: 35% of operating hours
Hybrid Mode: 25% of operating hours
Full Wet Mode: 40% of operating hours
Noise Control Features
Acoustic Design:
Fan Speed Control: VFD reduces noise at part load
Blade Design: Low-noise airfoil blades
Motor Selection: Premium efficiency, quiet operation
Sound Attenuation: Inlet/outlet silencers
Predicted Sound Levels:
Dry Mode: 75 dBA @ 3 feet
Hybrid Mode: 78 dBA @ 3 feet
Full Wet Mode: 82 dBA @ 3 feet
Property Line: <55 dBA (meets residential limits)
Additional Noise Mitigation:
Acoustic Barriers: 8' high around equipment
Vibration Isolation: Spring-mounted equipment
Operating Restrictions: Reduced speed 10 PM - 6 AM
Directional Discharge: Away from residential areas
Electrical Requirements
Power Requirements:
Total Connected Load: 150 kW
Typical Operating Load: 75 kW
Voltage: 480V, 3-phase, 60 Hz
Power Factor: >0.95 with VFDs
Electrical Components:
Main Disconnect: 200A, NEMA 3R
Motor Control Center: Indoor rated, with VFDs
Control Panel: NEMA 4X, touchscreen interface
Emergency Stop: Accessible from multiple locations
Electrical Installation:
Conduit: Rigid steel, weatherproof
Wiring: THWN-2, sized for VFD loads
Grounding: Equipment and system grounding
Lightning Protection: Surge protection devices
Installation Sequence
Phase 1: Structural (Weeks 1-6)
Structural engineering assessment
Roof reinforcement installation
Foundation pad construction
Anchor bolt installation
Vibration isolation system
Phase 2: Mechanical (Weeks 7-12)
Equipment crane lifts (2 days)
Piping installation and connections
Pump installation in mechanical room
Insulation and weatherproofing
Water treatment system installation
Phase 3: Electrical (Weeks 11-14)
Electrical service upgrade
Motor control center installation
Field wiring and connections
Control system programming
Testing and commissioning
Phase 4: Startup (Weeks 15-16)
System startup and testing
Performance verification
Operator training
Documentation handover
Warranty activation
Maintenance Requirements
Daily Monitoring:
Temperature readings: Inlet/outlet verification
Flow rates: Pump performance check
Water levels: Expansion tank and sump
Alarm systems: Control panel inspection
Weekly Maintenance:
Water treatment: Chemical levels and dosing
Cleaning: Debris removal from air intake
Vibration check: Equipment mounting inspection
Spray nozzles: Visual inspection for clogs
Monthly Maintenance:
Coil cleaning: High-pressure water wash
Filter replacement: Air intake filters
Lubrication: Motor and fan bearings
Calibration: Temperature and flow sensors
Quarterly Maintenance:
Comprehensive inspection: All components
Performance testing: Full capacity verification
Water quality testing: Legionella sampling
Electrical testing: Motor and control systems
Cost Analysis
Equipment Costs:
Hybrid cooling towers (2 units): $220,000
Pumps and controls: $85,000
Water treatment system: $45,000
Electrical equipment: $75,000
Piping and accessories: $65,000
Instrumentation: $35,000
Total Equipment: $525,000
Installation Costs:
Structural modifications: $180,000
Mechanical installation: $120,000
Electrical installation: $85,000
Crane and rigging: $45,000
Permits and engineering: $40,000
Testing and commissioning: $30,000
Total Installation: $500,000
Total Project Cost: $1,025,000
Annual Operating Costs:
Electrical (hybrid operation): $95,000
Water usage (60% reduction): $8,000
Chemical treatment: $12,000
Maintenance: $18,000
Total Annual Operating: $133,000
Annual Savings vs Traditional: $25,000 - $40,000**
Warranty and Service
Equipment Warranty:
Cooling coils: 5 years
Fans and motors: 3 years
Controls and electrical: 2 years
Structural components: 2 years
Service Agreement:
Preventive maintenance: Monthly visits
Emergency service: 24/7 availability
Parts availability: Guaranteed for 10 years
Performance guarantee: 5 years
Training Program:
Operations training: 16 hours for building staff
Maintenance training: 24 hours for technicians
Troubleshooting guide: Comprehensive manual
Annual refresher: Included in service agreement
Environmental Benefits
Water Conservation:
60% reduction in water usage vs traditional cooling towers
Annual water savings: 2.5 million gallons
Reduced wastewater: Lower blowdown requirements
Energy Efficiency:
15-20% energy savings through hybrid operation
Reduced parasitic loads: Smaller spray pumps
Variable speed control: Optimized fan operation
Noise Reduction:
40% reduction in average noise levels
Improved community relations: Quieter operation
Compliance assurance: Meets residential noise limits
Environmental Compliance:
Reduced chemical usage: Closed-circuit design
Lower emissions: Reduced water treatment chemicals
Sustainable operation: Optimized resource utilization
Hybrid Dry/Wet Cooling System
Complete Operation Guide and Technical Documentation
Table of Contents
System Overview
What is a Hybrid Dry/Wet Cooling System?
A hybrid cooling system combines two distinct cooling methods in a single integrated unit:
Dry Cooling: Heat transfer through finned coils using ambient air only
Wet Cooling: Evaporative cooling assist using water spray over the same coils
This dual-mode operation allows the system to automatically adapt to changing weather conditions, optimizing performance, energy consumption, and water usage throughout the year.
Key Advantages Over Traditional Systems
Traditional Cooling Tower Problems:
Always uses water (even in cool weather)
Constant chemical treatment required
Fixed approach to wet bulb temperature
Single operating mode regardless of conditions
Higher water consumption and treatment costs
Hybrid System Solutions:
Weather-adaptive operation: Automatically switches between dry and wet modes
60% water usage reduction: Dry operation eliminates water use during cooler periods
40% noise reduction: Quieter operation during dry mode
15-20% energy savings: Optimized operation for actual conditions
Extended equipment life: Reduced chemical exposure and mechanical stress
Operating Principles
Basic Heat Transfer Mechanisms
Dry Cooling (Sensible Heat Transfer)
Process:
Hot condenser water (97°F) flows through finned tube coils
Ambient air is drawn across coils by induced-draft fans
Heat transfers from water to air through conduction and convection
Air temperature rises while water temperature decreases
Cooling capacity depends on temperature difference (97°F - ambient)
Formula:
Q = U × A × ΔT
Where:
Q = Heat transfer rate (BTU/hr)
U = Overall heat transfer coefficient
A = Heat transfer surface area
ΔT = Temperature difference (water - air)
Effectiveness:
High effectiveness: When ambient < 65°F (32°F+ temperature difference)
Moderate effectiveness: When ambient 65-75°F (22-32°F difference)
Low effectiveness: When ambient > 75°F (<22°F difference)
Wet Cooling (Evaporative Heat Transfer)
Process:
Water sprays over the same finned coils used for dry cooling
Spray water evaporates, cooling the air before it contacts coils
Air temperature approaches wet bulb temperature (not dry bulb)
Enhanced heat transfer due to lower effective air temperature
Combines sensible and latent heat transfer mechanisms
Enhanced Performance:
Effective air temperature: Approaches wet bulb (78°F design vs 95°F dry bulb)
Increased temperature difference: 19°F (97°F - 78°F) vs 2°F (97°F - 95°F)
Latent heat bonus: Evaporation provides additional cooling beyond sensible heat
Why Hybrid Operation Works
Seasonal Adaptation:
Winter months: Dry cooling sufficient due to cool ambient temperatures
Spring/Fall: Hybrid mode provides optimal efficiency
Summer months: Full wet mode ensures adequate capacity
Load Matching:
Low loads: Dry mode with reduced fan speed
Medium loads: Hybrid mode with partial spray
High loads: Full wet mode with maximum spray
Three Operating Modes
Mode 1: Dry Operation (Ambient ≤ 65°F)
How It Works:
Equipment Operation:
Fans: Variable speed operation based on load
Spray pumps: Completely shut off
Water system: Isolated from spray nozzles
Coils: Operate as dry heat exchangers only
Heat Transfer Process:
Hot condenser water enters coil headers at 97°F
Induced draft fans pull ambient air across finned coils
Heat conduction through tube walls to fins
Convection from fins to moving air stream
Heated air exhausts at higher temperature
Cooled water exits at 86°F target temperature
Performance Characteristics:
Capacity: 100% at 65°F ambient, higher at lower temperatures
Power consumption: 40 kW (fans only)
Water usage: Zero
Noise level: 75 dBA (lowest operating noise)
Example Scenario - 60°F Winter Day:
Conditions:
- Ambient temperature: 60°F
- Condenser water inlet: 97°F
- Target outlet: 86°F
- Temperature difference: 37°F
Operation:
- Fans operate at 60% speed (energy savings)
- Excellent heat transfer due to large ΔT
- No water consumption
- Quiet operation beneficial for residents
Control Logic for Dry Mode:
IF (Ambient Temperature ≤ 65°F) AND (Outlet Temperature ≤ 86°F)
THEN:
Spray_Pump = OFF
Fan_Speed = Variable based on load
Water_Valves = CLOSED
Mode = DRY_ONLY
Mode 2: Hybrid Operation (Ambient 65°F to 75°F)
How It Works:
Equipment Operation:
Fans: Higher speed operation as temperature difference decreases
Spray pumps: Partial operation (30-70% capacity)
Water system: Selective spray zones activated
Coils: Some sections dry, others with evaporative assist
Transition Process:
Initial dry operation: System starts in dry mode
Load monitoring: Outlet temperature monitored continuously
Spray activation: When outlet approaches 86°F, spray pumps start
Zone control: Water applied to specific coil sections first
Gradual increase: Spray coverage expands as needed
Automatic modulation: Continuous adjustment based on performance
Zone Control Strategy:
Zone 1: Hottest coil sections (water inlet side)
Zone 2: Intermediate temperature sections
Zone 3: Coolest coil sections (water outlet side)
Progression: Zones activate in sequence based on need
Performance Optimization:
Spray rate: 30-70% of full capacity
Fan speed: 70-90% of full speed
Power consumption: 50 kW (fans + partial spray)
Water usage: 30% of full wet mode
Example Scenario - 70°F Spring Day:
Morning Operation (Building Load: 60%):
- Starts in dry mode
- Outlet temperature: 85°F (acceptable)
- Mode: Dry only
Afternoon Operation (Building Load: 85%):
- Outlet temperature rises to 87°F
- Spray pump activates at 30% capacity
- Zone 1 coils receive spray
- Outlet temperature drops to 86°F
- Mode: Hybrid (30% spray)
Evening Operation (Building Load: 70%):
- Spray reduces to 20% capacity
- Mode: Hybrid (20% spray)
Control Logic for Hybrid Mode:
IF (65°F < Ambient Temperature ≤ 75°F)
THEN:
Monitor_Outlet_Temperature()
IF (Outlet_Temperature > 86°F)
THEN:
Spray_Pump = Proportional_Control(30-70%)
Activate_Spray_Zones(Sequential)
Fan_Speed = Increase_As_Needed()
Mode = HYBRID
IF (Outlet_Temperature ≤ 85°F)
THEN:
Reduce_Spray_Rate()
Mode = HYBRID_REDUCED
Mode 3: Full Wet Operation (Ambient > 75°F)
How It Works:
Equipment Operation:
Fans: Full speed operation
Spray pumps: 100% capacity operation
Water system: All spray zones active
Coils: Complete evaporative cooling coverage
Evaporative Cooling Process:
Water distribution: Uniform spray across all coil surfaces
Evaporation: Water evaporates, cooling air stream
Effective air temperature: Air cooled to near wet bulb temperature
Enhanced heat transfer: Large temperature difference restored
Drift elimination: Entrained water droplets removed
Continuous circulation: Water treatment and quality control
Water System Operation:
Spray pressure: 1.2 psi minimum for proper distribution
Nozzle type: Rotary spray, clog-resistant design
Distribution: Uniform coverage across coil face
Recirculation: Closed-loop system with makeup water
Blowdown: Continuous water quality maintenance
Performance Characteristics:
Capacity: 100% at design conditions (95°F DB / 78°F WB)
Power consumption: 60 kW (fans + full spray system)
Water usage: 15 GPM evaporation + 5 GPM blowdown
Noise level: 82 dBA (highest operating noise)
Example Scenario - 95°F Summer Day:
Design Conditions:
- Ambient dry bulb: 95°F
- Ambient wet bulb: 78°F
- Condenser water inlet: 97°F
- Target outlet: 86°F
Operation:
- Full spray system operation
- Air cooled to 78°F effective temperature
- Temperature difference: 19°F (97°F - 78°F)
- Fans at 100% speed
- All spray zones active
- Continuous water treatment
Control Logic for Full Wet Mode:
IF (Ambient_Temperature > 75°F)
THEN:
Spray_Pump = 100%
All_Spray_Zones = ACTIVE
Fan_Speed = 100%
Water_Treatment = CONTINUOUS
Blowdown_Control = ACTIVE
Mode = FULL_WET
Monitor_Performance()
IF (Outlet_Temperature > 86°F)
THEN:
Alarm_High_Temperature()
Check_System_Performance()
Control System Logic
Master Control Algorithm
Primary Control Loop:
MAIN_CONTROL_LOOP:
Read_Sensors()
Calculate_Load()
Determine_Operating_Mode()
Adjust_Equipment()
Log_Performance()
Wait_Control_Interval()
REPEAT
Sensor Inputs:
Outdoor temperature: Dry bulb measurement
Outdoor humidity: Wet bulb calculation
Condenser water inlet temperature: Heat load indication
Condenser water outlet temperature: Performance verification
Water flow rate: System capacity confirmation
Fan motor current: Power consumption monitoring
Spray pump pressure: Water system status
Decision Matrix:
Operating Mode Selection:
IF (Outdoor_DB ≤ 65°F) AND (Outlet_Temp ≤ 86°F):
Mode = DRY_ONLY
ELSIF (65°F < Outdoor_DB ≤ 75°F):
IF (Outlet_Temp > 86°F):
Mode = HYBRID
Spray_Level = Calculate_Required_Spray()
ELSE:
Mode = DRY_ONLY
ELSIF (Outdoor_DB > 75°F):
Mode = FULL_WET
ELSE:
Mode = EMERGENCY_OVERRIDE
Alert_Operations()
Advanced Control Features
Predictive Operation:
Weather Forecast Integration:
24-hour forecast: System prepares for temperature changes
Pre-cooling: Starts earlier mode transitions
Thermal mass consideration: Accounts for building response time
Energy optimization: Shifts loads to off-peak hours when possible
Implementation:
PREDICTIVE_CONTROL:
Weather_Forecast = Get_24Hour_Forecast()
IF (Temperature_Rising_Trend):
Pre_Start_Spray_System()
Increase_Fan_Speed_Gradually()
IF (Temperature_Falling_Trend):
Delay_Spray_Activation()
Reduce_Fan_Speed_Gradually()
IF (Peak_Load_Predicted):
Optimize_For_Peak_Demand()
Load-Based Optimization:
Heat Load Calculation:
Heat_Load = Flow_Rate × Specific_Heat × (Inlet_Temp - Outlet_Temp)
Load_Percentage = Current_Load / Design_Load × 100%
Equipment_Adjustment:
Fan_Speed = Load_Percentage × Base_Speed
Spray_Rate = MAX(0, (Load_Percentage - 70%) × Spray_Factor)
Staging Logic:
Single unit operation: When load < 60%
Dual unit operation: When load > 60%
Lead/lag rotation: Equalizes equipment wear
Automatic backup: Seamless switchover on failure
Energy Management:
Time-of-Day Control:
ENERGY_MANAGEMENT:
Current_Time = Get_System_Time()
IF (Off_Peak_Hours): // 10 PM - 6 AM
Reduce_Fan_Speed(10%)
Delay_Spray_Activation(2°F)
IF (Peak_Hours): // 2 PM - 6 PM
Optimize_For_Efficiency()
Monitor_Demand_Charges()
IF (Weekend):
Reduce_Setpoints(1°F)
Extend_Dry_Mode_Range()
Safety and Alarm Systems
Critical Alarms:
High outlet temperature: >88°F for 5 minutes
Low water flow: <900 GPM
Fan motor failure: Current or speed deviation
Spray pump failure: Low pressure or flow
Water treatment failure: Chemical levels out of range
Safety Interlocks:
Freeze protection: Drain spray system when ambient < 35°F
High wind shutdown: Stop fans when wind > 60 mph
Fire alarm interface: Emergency shutdown on fire alarm
Power failure recovery: Automatic restart with status verification
Water Management System
Spray System Design
Water Distribution:
Spray Nozzle Configuration:
Nozzle type: 2" rotary spray, clog-resistant
Spray pattern: 120° cone angle
Pressure range: 1.2 - 3.0 psi
Flow rate: 50 GPM per nozzle at design pressure
Material: 316 stainless steel construction
Distribution Header System:
Main header: 8" diameter, 316 stainless steel
Zone headers: 4" diameter, zone isolation valves
Nozzle connections: 2" with individual isolation
Drain connections: Low-point drains for system emptying
Water Quality Control:
Treatment System Components:
Chemical feed pumps: Automated dosing systems
Biocide generation: Chlorine dioxide on-site generation
pH control: Sulfuric acid automatic feed
Scale inhibitor: Phosphonate-based treatment
Corrosion inhibitor: Molybdate/phosphate blend
Water Quality Monitoring:
WATER_QUALITY_CONTROL:
Monitor_pH(Target: 7.0-8.0)
Monitor_Conductivity(Target: <3000 μS/cm)
Monitor_Biocide_Residual(Target: 0.5-1.0 ppm)
Monitor_Alkalinity(Target: 100-300 ppm)
IF (Parameter_Out_Of_Range):
Adjust_Chemical_Feed()
Log_Adjustment()
IF (Critical_Deviation):
Alarm_Water_Quality()
Consider_Blowdown()
Legionella Prevention
Multi-Barrier Approach:
Physical Barriers:
UV sterilization: 40 GPM UV system before spray
Temperature control: Maintain <68°F in spray water
Drift elimination: Prevent aerosol escape
Drainage: Eliminate stagnant water areas
Chemical Barriers:
Biocide residual: Continuous chlorine dioxide
pH optimization: Maintain 7.0-8.0 range
Nutrient control: Minimize organic matter
Biofilm prevention: Regular cleaning cycles
Operational Barriers:
Automatic flushing: System flushes after extended dry periods
Cleaning cycles: Weekly automated cleaning
Monitoring: Continuous water quality surveillance
Testing: Monthly third-party Legionella testing
Cleaning and Disinfection:
Automated Cleaning Cycle:
CLEANING_CYCLE (Weekly):
Drain_Spray_System()
Fill_With_Disinfectant(200 ppm Chlorine)
Circulate_For_4_Hours()
Drain_Disinfectant()
Flush_With_Fresh_Water()
Refill_With_Treated_Water()
Resume_Normal_Operation()
Water Conservation Features
Closed-Loop Design:
Recirculation: Spray water continuously recirculated
Makeup control: Automatic level control
Blowdown optimization: Conductivity-based blowdown
Leak detection: Flow monitoring for leak identification
Drainage and Recovery:
Sump design: Efficient water collection
Overflow prevention: Multi-level controls
Emergency drainage: Rapid drain capability
Water recovery: Condensate collection where applicable
Energy Efficiency Features
Variable Speed Control
Fan Speed Optimization:
Affinity Laws Application:
Flow: Proportional to speed (CFM ∝ RPM)
Pressure: Proportional to speed squared (P ∝ RPM²)
Power: Proportional to speed cubed (Power ∝ RPM³)
Energy Savings Example:
At 50% Speed:
- Airflow: 50% of design
- Power: 12.5% of design (50%³)
- Energy savings: 87.5%
Pump Speed Control:
Spray Pump Optimization:
Pressure control: Maintain optimal spray pressure
Flow modulation: Match spray rate to cooling need
Energy reduction: Significant savings at part load
Load Matching Strategies
Demand-Based Operation:
Real-Time Load Calculation:
LOAD_OPTIMIZATION:
Current_Load = Calculate_Heat_Load()
Design_Load = 5,500,000 BTU/hr
Load_Ratio = Current_Load / Design_Load
Fan_Speed = MIN(100%, Load_Ratio × 1.1)
Spray_Rate = MAX(0%, (Load_Ratio - 0.7) × 1.4)
Seasonal Optimization:
Miami Climate Profile:
December-February: Primarily dry operation (energy savings)
March-May: Hybrid operation (balanced efficiency)
June-August: Full wet operation (maximum capacity)
September-November: Hybrid operation (extended efficiency)
Peak Demand Management
Utility Integration:
Demand Response Features:
Peak shaving: Reduce load during utility peak periods
Time-of-use optimization: Shift loads to off-peak hours
Demand limiting: Prevent demand spikes
Power factor correction: Maintain >0.95 power factor
Implementation:
DEMAND_MANAGEMENT:
Monitor_Utility_Signals()
IF (Peak_Demand_Period):
Increase_Outlet_Setpoint(1°F)
Reduce_Fan_Speed(10%)
Delay_Spray_Activation()
IF (Critical_Peak_Event):
Reduce_Setpoint(2°F)
Minimum_Operation_Mode()
Alert_Building_Management()
Maintenance Advantages
Reduced Chemical Exposure
Dry Mode Benefits:
No chemical contact: Coils operate chemical-free 35% of time
Reduced corrosion: Less chemical exposure extends equipment life
Simplified maintenance: No chemical handling during dry periods
Cost savings: Reduced chemical consumption
Intermittent Spray Operation:
Reduced scaling: Less continuous water contact
Cleaning intervals: Extended time between cleanings
Chemical effectiveness: Higher concentration when needed
System longevity: Reduced wear from chemical exposure
Modular Maintenance
System Isolation:
Independent Maintenance:
Dry system: Can be maintained while spray system operates
Spray system: Can be serviced while dry cooling continues
Zone maintenance: Individual spray zones can be isolated
Redundancy: System continues operating during maintenance
Service Access:
Maintenance-Friendly Design:
Accessible components: All major components reachable
Removable sections: Coil sections removable for cleaning
Service platforms: Integrated maintenance walkways
Lifting points: Built-in crane attachment points
Predictive Maintenance
Condition Monitoring:
Continuous Monitoring:
Vibration analysis: Motor and fan bearing condition
Temperature monitoring: Coil and component temperatures
Pressure monitoring: System pressure trends
Flow monitoring: Performance degradation detection
Maintenance Scheduling:
PREDICTIVE_MAINTENANCE:
Monitor_Performance_Trends()
IF (Efficiency_Decline > 5%):
Schedule_Coil_Cleaning()
IF (Vibration_Increase > 20%):
Schedule_Bearing_Inspection()
IF (Pressure_Drop_Increase > 10%):
Schedule_Filter_Replacement()
Generate_Maintenance_Report()
System Specifications
Equipment Specifications
Cooling Tower Units (Quantity: 2)
Model: EVAPCO eco-ATWB-H-1847 or equivalent
Cooling capacity: 500 GPM each (1000 GPM total)
Heat rejection: 2,750,000 BTU/hr each
Dimensions: 20' L × 8.5' W × 12' H
Operating weight: 32,000 lbs each
Dry weight: 18,000 lbs each
Heat Exchanger:
Type: Finned tube, closed circuit
Tube material: 304 stainless steel
Tube diameter: 1" OD, 0.834" ID
Fin material: Aluminum with protective coating
Fin density: 8 fins per inch
Surface area: 12,500 sq ft per unit
Fan System:
Fan type: Axial flow, induced draft
Fan diameter: 84 inches
Fan motor: 20 HP, 1800 RPM, premium efficiency
Drive type: Direct drive with VFD
Airflow: 32,000 CFM at design conditions
Sound level: 82 dBA at 3 feet
Spray System:
Spray pump: 5 HP centrifugal, VFD controlled
Spray rate: 250 GPM per unit at design conditions
Spray pressure: 1.2 psi minimum, 3.0 psi maximum
Nozzles: 2" rotary spray, 316 stainless steel
Distribution: Uniform spray across coil face
Electrical Specifications
Power Requirements:
Total connected load: 150 kW
Typical operating load: 75 kW
Voltage: 480V, 3-phase, 60 Hz
Power factor: >0.95 with VFDs
Efficiency: 94% overall system efficiency
Control System:
Main controller: Allen-Bradley PLC or equivalent
Communication: Ethernet/IP, Modbus RTU
Interface: Color touchscreen HMI
Remote monitoring: Web-based access
Data logging: 1-year data storage capacity
Performance Specifications
Design Conditions:
Ambient design: 95°F DB / 78°F WB
Condenser water inlet: 97°F
Condenser water outlet: 86°F ± 1°F
Flow rate: 1000 GPM ± 50 GPM
Approach: 8°F to wet bulb temperature
Operating Ranges:
Dry mode: Effective to 65°F ambient
Hybrid mode: 65°F to 75°F ambient
Full wet mode: 75°F+ ambient
Turndown ratio: 10:1 with VFD control
Installation Requirements
Structural Requirements
Foundation Design:
Concrete Pads (per unit):
Dimensions: 22' × 10' × 3' thick
Concrete strength: 4000 PSI minimum
Reinforcement: #6 rebar, 12" O.C. both ways
Anchor bolts: 1.5" diameter, 316 stainless steel
Embedment: 36" minimum into concrete
Structural Modifications:
Roof Reinforcement:
Load analysis: Structural engineer evaluation required
Steel reinforcement: Additional beams and columns
Load distribution: Spread loads to building structure
Seismic restraints: Flexible connections for movement
Wind Load Design:
Design wind speed: 150 mph (Category 4 hurricane)
Uplift resistance: 75 PSF
Lateral bracing: Steel frame tie-downs
Safety factor: 2.0 on all connections
Mechanical Installation
Piping System:
Main Distribution:
Pipe material: Schedule 40 carbon steel
Pipe sizes: 12" mains, 8" branches, 4" connections
Insulation: 2" closed-cell foam, weatherproof jacket
Supports: Steel pipe supports, 10' maximum spacing
Water Treatment:
Chemical feed lines: 1" PVC, double-contained
Sampling connections: 1/2" quick-disconnect fittings
Drain connections: 4" PVC to building drain
Makeup water: 2" connection to domestic water
Pumping System:
Primary Pumps:
Location: Mechanical room (not rooftop)
Quantity: 2 operating + 1 standby
Capacity: 500 GPM each at 75 ft TDH
Motor: 60 HP, premium efficiency
Control: Variable frequency drives
Electrical Installation
Power Distribution:
Service size: 200A, 480V, 3-phase
Conduit: Rigid steel, weatherproof
Wiring: THWN-2, sized for VFD harmonic loads
Grounding: Equipment and system grounding per NEC
Control Wiring:
Control voltage: 120V for controls, 24V for sensors
Communication: Shielded twisted pair for data
Sensors: RTD temperature sensors, 4-20mA output
Instrumentation: Magnetic flow meters, pressure transmitters
Installation Sequence
Phase 1: Preparation (Weeks 1-2)
Permits: Obtain all required permits
Structural assessment: Engineer evaluation
Material procurement: Long-lead items ordered
Site preparation: Clear installation area
Safety planning: Crane and rigging plans
Phase 2: Structural (Weeks 3-6)
Roof modification: Structural reinforcement
Foundation: Concrete pad installation
Anchor bolts: Precision placement
Curing: Concrete strength verification
Preparation: Final site preparation
Phase 3: Mechanical (Weeks 7-12)
Equipment delivery: Coordinated crane lifts
Unit placement: Precision positioning
Piping installation: All water systems
Pump installation: Mechanical room equipment
System connections: All mechanical connections
Phase 4: Electrical (Weeks 11-14)
Power installation: Service and distribution
Control wiring: All control circuits
Instrumentation: Sensors and monitoring
Programming: PLC and HMI programming
Testing: Electrical system testing
Phase 5: Commissioning (Weeks 15-16)
System startup: Initial operation
Performance testing: Capacity verification
Control verification: All modes tested
Training: Operator training program
Documentation: Final documentation package
Cost Analysis
Capital Costs
Equipment Costs:
Hybrid cooling towers (2 units): $220,000
Pumps and motors: $85,000
Water treatment system: $45,000
Electrical equipment: $75,000
Piping and accessories: $65,000
Instrumentation and controls: $35,000
Subtotal Equipment: $525,000
Installation Costs:
Structural modifications: $180,000
Mechanical installation: $120,000
Electrical installation: $85,000
Crane and rigging: $45,000
Permits and engineering: $40,000
Testing and commissioning: $30,000
Subtotal Installation: $500,000
Total Capital Cost: $1,025,000
Operating Costs (Annual)
Energy Costs:
Electrical Consumption:
Dry mode operation (35% of year): $22,000
Hybrid mode operation (25% of year): $28,000
Full wet mode operation (40% of year): $45,000
Total electrical: $95,000
Water Costs:
Makeup water: $8,000 (60% reduction vs traditional)
Wastewater: $3,000
Total water: $11,000
Maintenance Costs:
Chemical treatment: $12,000
Preventive maintenance: $15,000
Repairs and parts: $8,000
Annual service contract: $12,000
Total maintenance: $47,000
Total Annual Operating: $153,000
Comparison Analysis
Traditional Cooling Tower:
Capital cost: $895,000
Annual operating: $195,000
Water usage: 18,000 gallons/year
Chemical cost: $18,000/year
Hybrid System:
Capital cost: $1,025,000
Annual operating: $153,000
Water usage: 7,200 gallons/year (60% reduction)
Chemical cost: $12,000/year
Annual Savings: $42,000
Payback Period: 3.1 years
Life Cycle Cost Analysis (20 Years)
Traditional System:
Initial cost: $895,000
Operating costs: $3,900,000
Major overhauls: $300,000
Total 20-year cost: $5,095,000
Hybrid System:
Initial cost: $1,025,000
Operating costs: $3,060,000
Major overhauls: $200,000
Total 20-year cost: $4,285,000
20-Year Savings: $810,000
Troubleshooting Guide
Common Operating Issues
High Outlet Temperature
Symptoms:
Outlet temperature > 88°F
Insufficient cooling capacity
Building complaints
Possible Causes:
**Inadequate air
This report is for educational purposes only and a licensed Mechanical or Electrical engineer must be consulted before any actual work is contemplated.